Do large addition projects EVER end?
Forum rules
Be kind. No government, state, or local politics allowed. Admin has final decision for any/all removed posts.
Be kind. No government, state, or local politics allowed. Admin has final decision for any/all removed posts.
- WoodSheddin
- 5 valves
- Posts: 1498
- Joined: Thu Mar 18, 2004 9:44 pm
- Location: On the bike
- Contact:
- windshieldbug
- Once got the "hand" as a cue
- Posts: 11513
- Joined: Tue Mar 01, 2005 4:41 pm
- Location: 8vb
- gwwilk
- 3 valves
- Posts: 448
- Joined: Fri Mar 19, 2004 12:06 am
- Location: Lincoln, NE
Re: Do large addition projects EVER end?
Hmmm...punch blocks, junction boxes, networking and cable TV cables everywhere, a ton of work undone. Looks like a smart home in the making with whole house everything.WoodSheddin wrote:
Whatcha doin'?
- WoodSheddin
- 5 valves
- Posts: 1498
- Joined: Thu Mar 18, 2004 9:44 pm
- Location: On the bike
- Contact:
Re: Do large addition projects EVER end?
gwwilk wrote:
Hmmm...punch blocks, junction boxes, networking and cable TV cables everywhere, a ton of work undone. Looks like a smart home in the making with whole house everything.
Whatcha doin'?
Wired up the addition and the old house with low voltage. 11 total wall jacks each containing 2 RG6 coax and 2 Cat 5e. Two TV, 1 data, and 1 telephone ready for up to 3 lines. 66 blocks for voice. wall plates and keystone jacks on the wall for patching. Router and switch will be wall mounted. Also placed 2 smurf tubes with pull strings for future wiring if needed.
This is all getting fed with the shiny new Verizon FiOS TV and internet which just came online in my neighborhood. FiOS TV is gonna ROCK!!!
sean chisham
- Chuck(G)
- 6 valves
- Posts: 5679
- Joined: Fri Mar 19, 2004 12:48 am
- Location: Not out of the woods yet.
- Contact:
There comes a time in such project when one of several things happens:
- You move.
- You get divorced and are forced to move.
- You run out of money and are evicted by the bank.
- The house burns down.
- You get tired of the hassle and learn to "live with it' and those grand plans remain undone decades later.
- FarahShazam
- 4 valves
- Posts: 673
- Joined: Fri Mar 19, 2004 3:05 pm
FTR: that wiring WILL be finished. We have a contractor workin
on the rest of it. The contract didn't include data wiring; only electrical.
If he doesn't finish it, it will be covered by drywall. He did an amazing job
If we paid someone else, I shudder to think how much they would have charged us. 
We are having 800sq ft. added--2 levels; a family room, 2 bedrooms (in my hopes of expanding the family), and a master bathroom.
We are now living in 700squ ft (only) with the kid sleeping with us.
We hope to be finished with the contractor's part in 2 months time. We will never be finished with the rest of it. On the list of things to do:
--shed
--new fence
--deck and maybe a hottub
--repiping the older part of the house (main water line needs replacing)
--paint older part of house
--fix our landscapped yard (tons of potential there).
This is just.the.start.
I'm afraid

on the rest of it. The contract didn't include data wiring; only electrical.

If he doesn't finish it, it will be covered by drywall. He did an amazing job


We are having 800sq ft. added--2 levels; a family room, 2 bedrooms (in my hopes of expanding the family), and a master bathroom.


We hope to be finished with the contractor's part in 2 months time. We will never be finished with the rest of it. On the list of things to do:
--shed
--new fence
--deck and maybe a hottub
--repiping the older part of the house (main water line needs replacing)
--paint older part of house
--fix our landscapped yard (tons of potential there).
This is just.the.start.
I'm afraid

--farah chisham
- Dan Schultz
- TubaTinker
- Posts: 10424
- Joined: Thu Mar 18, 2004 10:46 pm
- Location: Newburgh, Indiana
- Contact:
I still got a dial-up 

Dan Schultz
"The Village Tinker"
http://www.thevillagetinker.com" target="_blank
Current 'stable'... Rudolf Meinl 5/4, Marzan (by Willson) euph, King 2341, Alphorn, and other strange stuff.
"The Village Tinker"
http://www.thevillagetinker.com" target="_blank
Current 'stable'... Rudolf Meinl 5/4, Marzan (by Willson) euph, King 2341, Alphorn, and other strange stuff.
-
- 6 valves
- Posts: 2530
- Joined: Mon Mar 22, 2004 11:09 pm
- Location: alabama gulf coast
I spent five years restoring a wooden boat to look like new and then I made the mistake of dragging it home on it's trailer and parking it in the yard. My wife took one look at the boat and demanded, "I want my house to look like that." It took three years to do that detailed a paint job on the house. Lots-o-varnish.Then we sold the place and made a killing.
She was right.
She was right.

-
- 6 valves
- Posts: 2530
- Joined: Mon Mar 22, 2004 11:09 pm
- Location: alabama gulf coast
If you're building a place, you have to wait to move in. I you're renovating, do one room at a time and then finish up and take a few months off before starting the next project. It is important to have an opportunity to savor the fruits of your labor before ripping into the place again.
All the kids in our neighborhood came to our house to play with our kids.
I kept the yard neat but with all the ball games in our front yard it was pointless to fuss much with the lawn.
Even today with the kids grown and gone I can still see first,second and third base in the grass on the front lawn.
All the kids in our neighborhood came to our house to play with our kids.
I kept the yard neat but with all the ball games in our front yard it was pointless to fuss much with the lawn.
Even today with the kids grown and gone I can still see first,second and third base in the grass on the front lawn.